The Instructions Sheet
Four things to read first, eight steps and what the planner does not do.
A kitchen layout is decided once and lived with for years. This free Excel plans twelve zones against what FSSAI's Schedule 4 asks for, checks that food moves one way from the delivery door to the pass, and adds up your own equipment to see whether it fits the floor. For dine-in, QSR, cafe and cloud kitchens. Updated November 2026.
Four things to read first, eight steps and what the planner does not do.
Six answers about your kitchen, then twelve zones plus two you can name: whether each is needed, the area you give it, the area its equipment needs, and its order along the food flow.
Up to 60 items with zone, quantity, width, depth and working space in front, turned into square feet.
Twenty Schedule 4 points, each with what the rule says, answered Yes, No or Not applicable.
A zone with no space, equipment that will not fit, a floor that is too small, or food that moves backwards.
A made-up 60-cover dine-in kitchen in Pune on 600 sq ft, with one layout check answered No to show a flag.
Petpooja POSS can split KOTs by station, so a kitchen laid out in zones sends each order line to the counter that cooks it, instead of one ticket travelling the whole line.
Explore Petpooja POSSMost layout advice is about speed. Schedule 4 of FSSAI's licensing regulations adds the part a licence depends on. Part II, which binds every licensed food business, asks for a layout that keeps food preparation away from goods receiving as far as possible, and for floor drains that flow opposite to the direction of food preparation. Our post on why a good kitchen layout matters covers the speed side.
Part V adds the food service rules on top: a chimney suited to the kitchen before you start trading if you cook or fry, a separate preparation area and utensils for raw meat, poultry and seafood, and a separate place for washing pots. Each of those needs floor space, so it belongs in the plan, not in a fix after the inspection.
The other half is space. We give no square feet per cover figure, because we could not find one we could verify. The planner adds up the back-of-house equipment you will actually install, and the space to work it, and compares that with your floor.
If you have not chosen the equipment yet, start with our cloud kitchen equipment planner or the one for your format, and copy the list into the Equipment sheet.
Here's a preview of what you'll get inside, sheet by sheet, in the order they open.
From goods receiving to the chemical store, each marked for what Schedule 4 asks.
Source: Schedule 4, Parts II and V, FSS (Licensing and Registration of Food Businesses) Regulations 2011, read 03-Nov-2026Layout points from Schedule 4, from drain direction to screens on every opening.
Source: Schedule 4, Parts II and V, read 03-Nov-2026No square feet per cover and no standard aisle width: the space comes from your own equipment.
Source: no Indian figure we could verifyA figure from someone else's kitchen fits someone else's menu. Size from your equipment and the space to use it; our cafe equipment planner shows how to build that list.
Receiving, stores, preparation, cooking, the pass. A route where cooked food crosses raw food or waste is the layout fault that is hardest to fix later. Our kitchen layout tips show the common shapes.
Schedule 4 Part II asks for drains that flow opposite to the direction of food preparation. Set the floor slope before the tiles go down.
Part V asks for a separate preparation area and separate utensils for raw meat, poultry and seafood. On a small floor that can be, in our reading, a dedicated table and sink, but it has to be planned.
Part II asks that toilets and changing rooms do not open directly into food areas. It is a wall and a door, and far cheaper to plan than to move.
Part V asks for a chimney with suction suited to the kitchen, installed before you start, wherever you cook or fry. It shapes the ceiling and the cooking line.
Part II asks for chemicals to be stored separately. Give them a cabinet of their own, away from food.
| Aspect | A sketch on paper | With this planner |
|---|---|---|
| Space | A square feet per cover guess | Your equipment and its working space, added up |
| FSSAI points | Found at inspection | Twenty Schedule 4 checks before fit-out |
| Food flow | Decided by where the doors happen to be | Zones numbered and checked to move forward |
| Non-veg preparation | Shared with veg | Its own zone when you serve non-veg |
| Licence or registration | Same advice for both | Asked for, or good practice, by tier |
| Handing over to a designer | A sketch and a list | Zone areas, equipment sizes and the checks |
Swipe the table sideways to see the full comparison.
Download the free restaurant kitchen layout planner and check your plan before fit-out.
Petpooja is India's leading SME business software suite, trusted by 1,50,000+ businesses across restaurants, retail, healthcare, manufacturing, and more. From billing and payroll to task management and procurement Petpooja helps Indian businesses run better, every day.
A good kitchen workflow follows the layout. A kitchen display system can show each station only its own orders. Ask for a walkthrough of Petpooja POSS.